ROC# 282700/305145

How Long Does It Take To Install Solar Panels?

Many Arizona residents are making the switch to solar energy and installing solar panels on their homes and businesses. However, many don’t understand the installation process or how long it takes to complete, so how long does it take to install solar panels?

Our team at Solar Solutions is here to explain more about solar panels and how long installation takes in Arizona.

Solar Solutions is your experienced solar installer in Arizona. If you want to upgrade your Arizona home with top-quality solar panels, call our experts at (520) 858-0220.

Why Go Solar?

Solar power is one of the cleanest forms of energy. Switching to a residential or commercial solar panel system helps diminish your carbon footprint while potentially decreasing your monthly energy payments. Solar panels provide exceptional energy, even if the power grid goes down, keeping your electronics up and running without harming the environment.

How Long Does Solar Panel Installation Take?

Solar panel installation requires more than just securing panels onto your property’s roof. It consists of several steps and inspections that many home and business owners might not be aware of, so how long does it take to install solar panels?

Although panel installation times range from six hours to three days, the whole process can take several months. Below are the primary installation steps and their average duration.

  • Site assessment: one week
  • Custom solar panel system design: two to three weeks
  • Building and electrical permit application: two to seven weeks
  • Equipment ordering and installation scheduling: one to four weeks
  • Installation: six hours to three days
  • City Inspection: one to two weeks
  • Utility interconnection and operation permission: two to six weeks

If everything goes smoothly and as planned, technicians can complete the entire process in two and six months. This might sound extensive, but many Arizona residents believe it’s worth the wait since it provides greener energy and can help them save money on their energy bills.

Additional Factors That Can Extend Installation Times

Although technicians can install most residential and commercial solar panels within six months, other factors can extend the process. Below are some additional elements that affect installation times:

  • HOA (Homeowner’s Association) approval
  • Roof repair 
  • Unpermitted service panels and structures
  • Equipment availability

At Solar Solutions, we take great strides to install your solar panels in a reasonable amount of time while ensuring a first-rate process. Our team will guide you through the process and help you with anything you need along the way.

Contact Solar Solutions for Outstanding Solar Panel Installation in Arizona

Next time you wonder, “How long does it take to install solar panels?” contact our experts at Solar Solutions. Our technicians will equip your Arizona home or business with top-quality solar panels that provide decades of exceptional power without adversely affecting the environment. We take the stress out of buying solar panels and will have your system installed in no time.

Give our Solar Solutions team a call at (520) 858-0220 and upgrade your Arizona property to solar energy today!


footer-logo

© Solar Solution - AZ ROC 282700